Thursday, March 3, 2011

Porches Prepared to pour concrete

Second Floor Erected

First Floor Framing Begins

First Floor Deck put on

Foundation waterproofing applied

Drain tile system installed

Basement & Porches Stoned

Foundation Erected

Poured Footings protected for frost

Footings Poured

Excavation & Footings Preparation