Current Project - New Construction

26 Sam Hill Rd, Malvern - Follow the progress of a home being built from start to finish. Feel free to drive by to see the progress and or call us if you have an interest in having us design and build a custom home for your family.

Thursday, May 26, 2011







Posted by Renehan Building Group at 4:13 PM 0 comments
Email ThisBlogThis!Share to TwitterShare to Facebook




Posted by Renehan Building Group at 4:09 PM 0 comments
Email ThisBlogThis!Share to TwitterShare to Facebook





Posted by Renehan Building Group at 4:07 PM 0 comments
Email ThisBlogThis!Share to TwitterShare to Facebook

Tuesday, March 8, 2011

Masonry Fireplace being built

Posted by Renehan Building Group at 11:27 AM 0 comments
Email ThisBlogThis!Share to TwitterShare to Facebook

Completing Framing & Loading Roof

Posted by Renehan Building Group at 11:19 AM 0 comments
Email ThisBlogThis!Share to TwitterShare to Facebook

Thursday, March 3, 2011

Porches Prepared to pour concrete

Posted by Renehan Building Group at 2:43 PM 0 comments
Email ThisBlogThis!Share to TwitterShare to Facebook

Second Floor Erected

Posted by Renehan Building Group at 2:43 PM 0 comments
Email ThisBlogThis!Share to TwitterShare to Facebook
Older Posts Home
Subscribe to: Posts (Atom)

Followers

About Me

Renehan Building Group
View my complete profile

Blog Archive

  • ▼  2011 (16)
    • ▼  May (3)
    • ►  March (13)
      • Masonry Fireplace being built
      • Completing Framing & Loading Roof
      • Porches Prepared to pour concrete
      • Second Floor Erected
      • First Floor Framing Begins
      • First Floor Deck put on
      • Foundation waterproofing applied
      • Drain tile system installed
      • Basement & Porches Stoned
      • Foundation Erected
      • Poured Footings protected for frost
      • Footings Poured
      • Excavation & Footings Preparation
Awesome Inc. template. Powered by Blogger.